English Login Get Registered Catalog Browser Contact Us
耐克森,全球电缆及电缆系统专家

关于耐克森

产品及解决方案

客户服务

耐克森招聘

新闻中心

Go
FY2011 presentation big banner









股价信息

Paris, 03/02/2012 - 17h35


今日头条

Presentation of Nexans’ Annual Results 2011 Presentation of Nexans’ Annual Results 2011

Watch the presentation of Nexans’ Annual  Results 2011

RWE Deutschland, Nexans and KIT launch “AmpaCity” project: the world’s longest superconductor system to replace inner-city high-voltage cable RWE Deutschland, Nexans and KIT launch “AmpaCity” project: the world’s longest superconductor system to replace inner-city high-voltage cable

The “AmpaCity” project has been kicked off: The RWE Group and its partners are just about to replace a 1-kilometre-long high-voltage cable connecting two transformer stations in the Ruhr city of Essen with a state-of-the-art superconductor solution.

Nexans goes live on grid with world’s first fault current limiter based on second-generation superconductors Nexans goes live on grid with world’s first fault current limiter based on second-generation superconductors

Nexans has successfully commissioned the world’s first resistive superconducting fault current limiter (SFCL) based on second-generation superconductor tapes.



2010 Annual Report

Spotlight on innovation

Renewable materials in durable cables Renewable materials in durable cables

The use of bio-based materials will allow us to reduce our dependence on oil.


耐克森 © 版权所有 2001 - 2012   相关条款 | 联系我们 | 站点地图